top of page

Improvements

Upgrades and Improvements to 3011

Since 2022, over $300,000 worth of improvements, upgrades & renovations have been made to this home and property... most within the past 24 months.

Here is a list of some of them:

  • Backup power Generator (for electricity outages in this area), and installation of new electrical panels and load-sharing modules

  • 200-amp electrical system

  • New water pump and treatment equipment (for our private water system) in two outside sheds

  • Two stairlifts, one outside and one inside​ of the house

  • House painting (entire outside + the lower floor inside)

  • New roof over oldest part of house

  • Improvements to fascia boards, soffits and gutters

  • Power-washing of roof and cleaning of gutters (May 2026)

  • New roof over front porch steps (at main entrance)

  • New front porch steps

  • New storage shed built behind the house (north side of building)

  • Replacement of outside deck, on second floor

  • Improvements to outside stairway (west side of house)

  • Rebuilding of water pump shed (lower section)

  • New "ensuite" bathroom (in the bed-rec-family room), with a heated floor and walk-in steam shower

  • Full renovation of smaller bathroom

  • Finishing of stairwell, bedrooms, and front room (closest to street)

  • New doors to all first floor rooms, plus new main door and three screen doors to outside

  • New baseboards throughout most of house

  • Insulation of crawl space and heating ducts under house

  • New fridge in kitchen, and updated fridge in downstairs pantry

  • New hot water tank

  • New lights in many parts of house

  • New blinds and drapes on some windows

  • New baseboard heaters in both water-system sheds

  • Rebuilding of north wall in the front, flex room

  • Repair of vent pipe in attic 

  • Access path cut to back of property

    ...plus many other upgrades and repairs.

bottom of page