top of page

Improvements

Upgrades and Improvements to 3011

Since 2021, over $300,000 worth of improvements, upgrades & renovations have been made to this home and property. (Most within the past 20 months.)

 

Here is a list of some of them:

​

  • Two stairlifts, one outside and one inside

  • Back-up power Generator (for the electricity outages in this area!)

  • Upgrade to 200-amp electrical system

​

  • House painting (entire outside, plus lower floor inside)

  • New roof over oldest part of house

  • Improvements to fascia boards, soffits and gutters

​

  • New front porch steps (at main door/entry)

  • New roof over front porch steps/entry

  • Deck replacement on second floor and improvements to outside stairs

  • New storage shed built behind house (north side of building)

​

  • Entirely new large bathroom, with heated floor and walk-in steam shower

  • Full renovation of smaller bathroom

  • Finishing of stairwell, bedrooms, and front room (closest to street)

  • New baseboards throughout most of house

  • New doors to all rooms inside, plus main door and three screen doors to outside

  • Insulation of crawl space under house

​​

  • New lights in many parts of house

  • New blinds and drapes on windows

  • New fridge

  • New hot water tank

  • New & upgraded pump and water treatment equipment (for our private water system)

  • Baseboard heaters added to both water-system sheds

  • Rebuild of pump-house shed (lower section)

​​​

  • Access path cut to back of property

​​​

   … plus other upgrades and repairs

​​​

bottom of page